Former Petrol Filling Station Decommissioning

THE BRIEF

 

Carry out phased demolition of above ground infrastructure including the retail shop, pole sign and canopy. Break up and remove existing hard standings. Remove all below-ground fuel tanks (21 in total), valve pits, interceptor and fuel infrastructure. Carry out remedial earthworks associated with known impacted soils.

 

 

THE SOLUTION

The first stage was to demolish the forecourt buildings and canopy. This gave clear access to the ground to remove the tanks and their associated pipe work. The site was checked for contamination before being backfilled and restored to a level surface.

 

 

THE OUTCOME

A pristine site.

CONTACT US

If you would like more information about our site decommissioning services or want to hire us please click the button below.

LCM Former Petrol Station Decommission Case Study
LCM Former Petrol Station Decommission Case Study
LCM Former Petrol Station Decommission Case Study
LCM Former Petrol Station Decommission Case Study
LCM Former Petrol Station Decommission Case Study
LCM Former Petrol Station Decommission Case Study

View More Case Studies

Share this post
Social media & sharing icons powered by UltimatelySocial